Skip to main content
. Author manuscript; available in PMC: 2021 Oct 1.
Published in final edited form as: Water Res. 2020 Jul 1;184:116120. doi: 10.1016/j.watres.2020.116120

Table 2.

Operations of GAC/sand columns with AOM and MC-LR.

EBCT(min) Column 1a Column 2a Column 3 Column 4 Column 5 b
Day 1–159 20 FI FI FI FI FI
Day 160–178 20 FI FI/AOM FI/AOM Dismantled c FI/AOM
Day 179–208 20 FI FI/AOM/MC-LR FI/AOM/MC-LR x FI/AOM/MC-LR
Day 209–242 10 FI FI/AOM/MC-LR FI/AOM/MC-LR x FI/AOM/MC-LR

FI: Filter influent for the column operation was obtained from a DWTP.

a

Filter biomass was inoculated before operation to facilitate the formation of biofilm.

b

Column 5 was regularly sterilized by autoclaving (10 min at 121 °C).

c

Column 4 was dismantled at day 159 and filter media samples were collected.