Skip to main content
. 2020 Oct 27;17(21):7877. doi: 10.3390/ijerph17217877

Figure 3.

Figure 3

Design of the sprint 4 × 5 m (S4 × 5 m). A and E are start and finish lines respectively. B, C and D are lines of change of direction.