Skip to main content
. 2020 Nov 12;20:283. doi: 10.1186/s12893-020-00952-z

Fig. 2.

Fig. 2

a The P-P diagram of the expected cumulative probability and observed cumulative probability of ICG-R15 value before PSM. b The P-P diagram of the expected cumulative probability and observed cumulative probability of ICG-R15 value after PSM. c The P-P diagram of the expected cumulative probability and observed cumulative probability of ICG-R15 value just based on serological index