Table 2.
Laboratory staff time [excluding planning and reporting] | 1200 hours |
---|---|
Total laboratory staff salary costs [excluding planning and reporting] | £19 385 |
Average sample processing time | 35.5 hours |
Weekday average sample processing time | 25.5 hours |
Administrative staff time estimate | 500 hours |
Laboratory consumables cost estimate per test kit | £3.61 |
Total number of swabs supplied to participants | 3360 |
Incurred costa | £75 906 |
Estimated in-kind contributionsb | £89 612 |
aThis figure represents the spend on services and equipment. The feasibility study inevitably incurred a high unit cost, and for example tripling the test numbers would have a negligible effect on cost.
bThis figure represents the costs absorbed by the existing service.