C1 |
Annual Operating cost |
This measure estimates the total operating cost involved per year in the operation and maintenance of a particular HCW treatment alternative. |
C2 |
Public Acceptability |
This measure takes into account the acceptability of a particular alternative by the public for HCW treatment. |
C3 |
Reliability |
This measure estimates the dependability of particular HCW treatment alternative for long term operation. |
C4 |
Treatment Efficiency |
This measure analyses the long term suitability and competency of a particular HCW treatment alternative. |
C5 |
Human Resource Requirement |
This measure is important for managing the skill, knowledge and competency required for carrying out a particular HCW treatment alternative and achieving the desired output. |
C6 |
Treatment System Capacity |
This measure analyses the amount of waste that can be treated by each HCW Treatment alternative in a particular cycle of operation. |
C7 |
Waste Residuals |
This measure analyses the amount of waste residual generated after the operation of a particular HCW treatment alternative. |
C8 |
Toxic Emissions and Health Effects |
This measure covers the environment degrading toxic emissions associated with each alternative and also the dangerous health effects on the people in the immediate surrounding of the operation. |
C9 |
Operational Safety |
This measure analyses the requirement of various safety procedures and risks associated with the operation of a particular HCW treatment alternative. |
C10 |
Infrastructure Requirement |
This measure takes into consideration the basic physical and organizational structures and facilities (eg. buildings, power supplies, machinery) needed for the operation of a particular HCW treatment alternative. |