Skip to main content
. Author manuscript; available in PMC: 2020 Nov 20.
Published in final edited form as: IEEE Trans Instrum Meas. 2018 Nov 1;68(9):3137–3150. doi: 10.1109/tim.2018.2874127

Fig. 5.

Fig. 5.

Test set-up where all of the ACE1 cables were connected to the same voltage source and 100 frames of data were collected. Inputs to the ACE1 current source were grounded.