Table 2.

Details of various pilot-scale and full-scale studies for remediation of hospital wastewater.

Study number Country Treatment Description Flow HRT SRT Plant type References
Study 1 Belgium A transportable pilot-scale subsurface flow CW (1 m3). The cubic tank was filled with a 80 cm layer of coarse Rhine gravel (8–16 mm, porosity = 40%, Macrophyte- Phragmites australis. 200 L/day 2 d Pilot-scale [96]
Study 2 Brazil UASB followed by 3 serial anaerobic filters 2.54 L/s 8 h Full-scale [6]
Study 3 Brazil ASP with extended aeration followed by chlorination 5 L/s 18 h Full-scale [6]
Study 4 China MBR: 6 m3 had 2 equal parts separated by a plate. 1 hollow fiber membrane module set was submerged in each part of the reactor. Each set consisted of 24 membrane modules, total membrane area = 96 m2 20 m3/day 7.2 h 180 d Full-scale [102]
Study 5 China Conventional ASP (aeration) 480 m3/day 35 d Full-scale [91]
Study 6 China Conventional ASP (aeration) 200 m3/day Full-scale [91]
Study 7 Denmark MBBR consisted of three identical reactors of 3 L in series (M1, M2 and M3) each containing 500 AnoxKaldnes™ K5 carriers (AnoxKaldnes, Lund, Sweden), Filling ratio = 50%. The mixing was performed by aeration, Flow =. Retention time 0.50 L/h 6 h for each reactor Pilot-scale [112]
Study 8 Denmark MBBR comprised of six reactors- M1 (900 L for BOD removal and denitrifying), M2 (900 L for nitrifying), M3A (900 L for nitrifying), M3B (900 L for nitrifying), M4 (500 L for denitrifying) and M5 (500 L for nitrifying), respectively. Filling ratio of 50% with 150,000 and 80,000 Anox K™5 carriers (AnoxKaldnes, Lund, Sweden) in the 900 L and 500 L reactors, respectively. M1, M2, M3A, M3B = 800 L/h, M4, M5 = 300 L/h M1, M2, M3A, M3B = 1.13 h, M4, M5 = 1.67 h Pilot-scale [113]
Study 9 Denmark MBR followed by 450 mg/L of PAC 2.2 m3/day 35 d Pilot-scale [10]
Study 10 Denmark MBR 2.2.m3/day 35 d Pilot-scale [10]
Study 11 Ethiopia Waste Stabilization Ponds: 2 facultative ponds (667 m2), 2 maturation ponds (401 m2, 396 m2), and 1 fish pond (862 m2) 29 d Full-scale [117]
Study 12 Ethiopia 8 horizontal subsurface flow CWs (4 m length, 1.2 m width and 0.6 m depth) with gravel and broken brick media as substrate. 165.75 L/day 4 d Pilot-scale [12], [97]
Study 13 Finland Ultrafiltration followed by pulsed corona discharge (30 W was applied for 1 kWh /m3 of pulse energy delivered) Pilot-scale [119]
Study 14 Spain MBR (11 m3) with 10 flat sheet (FS) chloral polyethylene membranes (0.8 m2 each). Coarse bubble aeration was provided, MLSS- 8 g/L 100 L/h 50 h 30 d [100]
Study 15 France Activated sludge incorporated with biofilms followed by ultrafiltration, Dissolved oxygen: 1–4.5 mg/L 100 L/day 22 h 20 d [90]
Study 16 Germany The unit comprised of a MBR: Membrane area per module = 320 m2, Total membrane area = 1600 m2 130 m3/day 31.3 h Pilot-scale [57]
Study 17 Germany MBR comprising of Mesh, primary settling tank (21 m3: HRT= 1 h), Oxic/anaerobic chamber (56 m3, suspended solid concentration= 10–12 g/L), microfiltration (102 m3) followed by NF/RO 130 m3/day Pilot-scale [104]
Study 18 Greece Pre-treatment (grit-removal), a mix tank, and a biological secondary treatment- Aeration tank (600 m3) followed by disinfection (chlorine dose 10–20 mg/L) 6 h 11 d Full-scale [89]
Study 19 India Conventional ASP followed by high pressure filtration (26 pounds/cm2) and chlorination (5% hypochlorite- 35 L per 0.3 million L of water. Pilot-scale [101]
Study 20 India Horizontal sub surface flow CW (1.5 m length, 0.65 m width and 0.5 m depth) 10 m3/day Pilot-scale [41]
Study 21 Indonesia Aerated Fixed Film bio filter Reactor followed by ozone reactor Pilot-scale [118]
Study 22 Italy Submerged MBR with UF shallow fiber membranes. biomass content (10–12 kg/m3) 90 L/h 14 h 50 d Pilot-scale [103]
Study 23 Iran 2 sets of cylindrical columns made of Plexiglass were used as MBBR reactors. Packing= 70%, Packing material for column 1- Kaldnes (K1) (Pakan Ghatreh, Iran) Packing material for column 2- lightweight expanded clay aggregate (LECA). Column’s dimension- inside diameter, height, overflow height, total volume, and effective volume were 30 cm, 150 cm, 130 cm, 105 L, and 91 L, respectively. Air was supplied from bottom of the columns using an air, MLSS = 3000 mg/L. 0.001–0.003 L/s 24 h Full-scale [114]
Study 24 Iran ASP (Aerobic and anaerobic zones) Pilot-scale [92]
Study 25 Korea Chemical flocculation followed by activated carbon adsorption Full-scale [207]
Study 26 Luxembourg MBR followed by UV (10 kW Medium pressure lamp, 1.11 gH2O2/L. 3.33 m3/day Pilot-scale [105]
Study 27 Nepal The system consists of a septic tank (16.7 m3), followed by a horizontal flow CW (140 m2) with 0.65–0.75 m depth and a vertical flow CW bed (120 m2) with 1 m depth. 20 m3/day Full-scale [98]
Study 28 Saudi Arabia ASP (Aerobic Tank) followed by sand filtration and chlorination process. 904 m3/day Full-scale [93]
Study 29 Saudi Arabia ASP (Aeration Tank with 3 blowers) followed by sand filtration and chlorination process. 622 m3/day Full-scale [93]
Study 30 Switzerland Primary clarifier followed by MBR ( Chamber 1 is oxic and chamber 2 is anoxic). 1.2 m3/day Pilot-scale [87]
Study 31 Switzerland Ozonation- 1.08 gO3/g Dissolved organic carbon 12–23 L/h Pilot-scale [88]
Study 32 Switzerland PAC- 23 mg/L 180 L/day Pilot-scale [88]
Study 33 Switzerland UV- 2400 J/m2 600 L/h Pilot-Scale [88]
Study 34 Switzerland MBR ( Chamber 1 is oxic and chamber 2 is anoxic) followed by Ozonation- 1.08 gO3/g Pilot-scale [88]
Study 35 Switzerland MBR ( Chamber 1 is oxic and chamber 2 is anoxic) followed by PAC- 23 mg/L Pilot-scale [88]
Study 36 Switzerland MBR ( Chamber 1 is oxic and chamber 2 is anoxic) followed by UV- 2400 J/m2 Pilot-scale [88]
Study 37 Thailand Vertical flow CW (1.5 m length, 0.6 m width and 0.6 m depth), The media bed contained sand, pea gravel and gravel with respective height of 0.1, 0.2, and 0.4 m from top to bottom. 75–85 L/day 5 d Pilot-scale [99]
Study 38 Thailand MBR with aeration supplied at 340 L/min 500 L/h 3 h Pilot-scale [50]
Study 39 Vietnam Physical, chemical treatment followed by ASP Full-scale [11]
Study 40 Vietnam ASP followed by filtration Full-scale [11]