Skip to main content
. 2020 Nov 3;125(11):e2019JE006290. doi: 10.1029/2019JE006290

Table 5.

Average Spectral Parameters Calculated From Five‐Location ChemCam Rasters of the Drill Tailings for the Successful and Unsuccessful (Shaded Cells) Drill Targets Studied Here

Drill target [sol] 750–840 nm slope 535 nm band depth 670/440 nm ratio
Oudam drill tailings (loose) [1364] 0.46e − 04 (6.63e − 06) 0.061 (0.001) 1.98 (0.04)
Oudam drill tailings (packed) [1366] −0.14e − 04 (5.54e − 06) 0.050 (0.001) 1.72 (0.01)
Oudam dump pile presieve [1368] −0.31e − 04 (6.62e − 06) 0.048 (0.001) 1.66 (0.01)
Marimba drill tailings (loose) [1425] −2.32e − 04 (4.88e − 06) 0.101 (0.001) 2.36 (0.02)
Marimba drill tailings (packed 3–5) [1425] −2.64e − 04 (3.78e − 05) 0.094 (0.003) 2.19 (0.09)
Marimba dump pile presieve [1427] −2.15e − 04 (5.21e − 06) 0.095 (0.002) 2.20 (0.01)
Quela drill tailings [1466] −1.73e − 04 (7.41e − 06) 0.162 (0.002) 4.28 (0.07)
Quela dump pile presieve [1467] −1.78e − 04 (5.27e − 06) 0.140 (0.002) 3.69 (0.08)
Sebina drill tailings [1496] −2.13e − 04 (9.90e − 06) 0.194 (0.007) 4.12 (0.23)
Lake Orcadie drill tailings [1978] −1.39e − 04 (5.64e − 06) 0.042 (0.002) 1.16 (0.01)
Stranraer predust removal tool [2005] −2.97e − 04 (1.65e − 05) 0.156 (0.020) 3.85 (0.34)
Duluth drill tailings [2059] −1.45e − 04 (1.85e − 05) 0.279 (0.011) 7.15 (0.38)
Stoer dump pile [2156] −0.51e − 04 (3.09e − 06) 0.200 (0.002) 5.38 (0.06)
Inverness drill tailings [2172] −0.37e − 04 (5.93e − 07) 0.074 (0.002) 2.84 (0.05)
Highfield drill tailings [2225] −0.54e − 04 (6.09e − 06) 0.027 (0.001) 1.39 (0.04)
Rock Hall tailings [2263] −2.13e − 04 (8.30e − 06) 0.165 (0.001) 4.11 (0.05)

Note. Numbers in parentheses are the standard deviation of the average spectral parameter.