Skip to main content
. 2020 Nov 26;216(8):138. doi: 10.1007/s11214-020-00764-w

Fig. 13.

Fig. 13

Integration and testing flowchart of the SCCT EQM. Including assembly, qualification campaign and post campaign verification and cleaning. Acronyms are manufacturing readiness review (MRR), isopropyl alcohol (IPA), breadboard (BB), dry-heat microbial reduction (DHMR), test readiness review (TRR), thermal vacuum test (TVAC). Other acronyms are given in the main text