Skip to main content
. 2020 Nov 13;20(22):6499. doi: 10.3390/s20226499

Table 2.

Accuracy evaluation of proposed methods in different damage scene.

Scene 1 Scene 2
Pre. Rec. Pre. Rec.
Damage 0.8622 0.8664 0.9026 0.9284
Non-damage 0.8964 0.8931 0.9125 0.8813
OA 0.8814 0.9069
TIME (min) 7.22 8.90