Table 5.
PS | Solar-PS† | Cylinder | Concentrator (mains powered) | |||
---|---|---|---|---|---|---|
Capital | Concentrators* |
675 |
675 |
675 |
||
Patient delivery-associated equipment |
495 |
495 |
187 |
495 |
||
Additional equipment |
8349 |
19 548 |
||||
Total equipment cost |
9519 |
20 718 |
187 |
1170 |
||
Transport | Teknon to site |
265 |
265 |
133 |
||
Shipping |
3947 |
3925 |
300 |
|||
Installation |
484 |
484 |
162 |
|||
Operating expenses | Electricity unit cost (per kWh) |
22.2 c Gambia, 15.8 c Fiji |
0 |
22.2 c Gambia, 15.8 c Fiji |
||
Maintenance |
2105 |
1585 |
842 |
|||
Cylinder refill |
Gambia |
44.52 |
||||
Fiji |
51.48 |
|||||
Cylinder rent pa |
Gambia |
0 |
||||
Fiji |
1007.28 |
|||||
Cylinder transport (per cylinder) | 11 |
PS – power storage; c – cents
*Exchange rates: 1US$ = Euro0.853 / GBP0.753.
†Standard Solar-PS system. Total equipment costs for the trailer-mounted version were US$26 963.