Skip to main content
. 2018 Aug 7;4(10):1439–1450. doi: 10.1039/c8ew00209f

Table 4.

Typical wastewater quality parameters measured before and after a 3 hour electrolysis cycle over the course of the field testing of the AMD prototype. Values are average of three replicates

Date(dd/mm/yyyy) Unfiltered COD (mg O2 L−1)
TKN or NH3 (mg N L1)
TSS (mg L1)
Chloride (mg Cl L1)
Total/free chlorine (mg Cl2 L1)
Before After Before After Before After Before After Before After
18/09/2014 32 n.d.
14/10/2014 100 31 100
03/11/2014 90 n.d. 100 50 182 35.1
29/11/2014a 43 11 15 2 100 30
23/02/2015 100 48
27/08/2015 0b 39b
01/12/2015 240 40 43 5
16/01/2016 223 26 235 203 <1c
02/02/2016 371 95 886 382 <1c 2.73c
31/03/2016 320 50 1.05d 2.04d 245 87
11/04/2016 234 56 25d 40d 180 35 425 390 <1c <1c
a

Analyses performed by third-party (Ahmedabad Municipal Corporation Central Lab). Total nitrogen was measured.

b

Total chlorine.

c

Free chlorine.

d

Potential interference for ammonia measurement.