Table 3.
E lagged R n months | CB | LI | ||||||
---|---|---|---|---|---|---|---|---|
Slope | Intercept | R 2 | p value | Slope | Intercept | R 2 | p value | |
0 | 0.24 | 73.40 | 0.33 | <0.01 | 0.28 | 55.75 | 0.37 | <0.01 |
1 | 0.36 | 47.52 | 0.73 | <0.01 | 0.40 | 30.63 | 0.74 | <0.01 |
2 | 0.37 | 46.43 | 0.77 | <0.01 | 0.41 | 29.79 | 0.76 | <0.01 |
3 | 0.29 | 63.02 | 0.49 | <0.01 | 0.32 | 49.47 | 0.47 | <0.01 |
4 | 0.14 | 96.15 | 0.11 | 0.01 | 0.13 | 89.28 | 0.08 | 0.03 |
5 | −0.04 | 137.38 | 0.01 | 0.50 | −0.07 | 135.11 | 0.02 | 0.28 |
Note. The equation is LE = Slope ×R n + Intercept.