Skip to main content
letter
. 2020 Dec 11;20(24):7117. doi: 10.3390/s20247117

Table 10.

Comparison of execution time between the four methodologies.

Method Points Running Time Total Execution Time (s)
Space Relocation (s) Displacement Estimation (s)
Grid 3527~3673 0.24 0.12 0.36
Tri 0.24 0.15 0.39
LSP 0.24 0.15 0.39
OSP 1.49 0.04 1.53