Skip to main content
. 2021 Jan 6;15:6. doi: 10.1186/s13037-020-00281-3

Fig. 10.

Fig. 10

a, b, c, and d: Photographs of a scapular specimens showing the placement of K-wire parallel to the glenoid fossa, guiding the screw placement into the coracoid process. Observe that the screw must be positioned parallel to the longest axis of the glenoid. e, f, and g: Fluoroscopy images showing the coracoid fixation