Skip to main content
. 2021 Jan 11;21:16. doi: 10.1186/s12874-020-01192-8

Fig. 2.

Fig. 2

Transition rates from the “AIC” model with 95% confidence intervals (shaded region). Point estimates and confidence intervals were defined from the time of the first event until the last event for each transition (solid lines). The point estimates were extrapolated to cover the interval [0,82] (dashed line)