Skip to main content
. 2021 Jan 26;11:2218. doi: 10.1038/s41598-020-80772-6

Figure 4.

Figure 4

(a) Plan of Structure B; (b) Enlarged cross-section of Structure B and its layers (0–4); (c) Pavement (marked as 1) overlain by olive pits (marked as 2) overlain by grey, soft clay (marked as 3); (d) A close-up of the pavement (marked as 1) overlain by olive pits (marked as 2) (SL refers to the high tide during 13. 3. 2018, at 1.30 PM) (Photos and drawing Ehud Galili).