Skip to main content
. 2020 Feb 5;10(3):e3508. doi: 10.21769/BioProtoc.3508

Figure 2. Mounting wafer construction process.

Figure 2.

i. Materials required for mounting wafer construction (1x stainless steel mounting wafer; 4x stainless steel washer; double-sided adhesive tape). ii. Apply double-sided adhesive tape to the bottom of each washer. iii. Secure each washer to the mounting wafer.