Skip to main content
. 2020 Aug 16;17(6):644ā€“653. doi: 10.1177/1740774520944377

Figure 4.

Figure 4.

Analysis example for a hypothetical trial. On the left panel, the duration-response curve is estimated and then a bootstrap CI is built around the point where it crosses the acceptability frontier. On the right panel, bootstrap CIs are built around the difference in efficacy (cure rate) between each arm and the longest (dā€‰=ā€‰20).