Skip to main content
. 2020 Nov 5;28(8):9682–9700. doi: 10.1007/s11356-020-11002-9

Table 2.

Calibrated horizontal and vertical hydraulic conductivities for the transect as in Figure 1 c

Zones Horizontal hydraulic conductivity [m s−1] Anisotropy ratio [-]
Canal bed 1.6 × 10−6 5
Silt lens 2.0 × 10−6 10
First aquifer 1.2 × 10−4 2.3
Semipermeable glacial till 4.1 × 10−6 2.5
Second aquifer - upper part 2.3 × 10−5 2.5
Second aquifer - lower part 5.8 × 10−6 5.3