Skip to main content
. 2021 Jan 28;12:636086. doi: 10.3389/fpsyg.2021.636086

TABLE 8.

TAM regression results explaining BI.

Information systems
Music and Arts
R2 Coefficient R2 Coefficient
April 0.56 0.52
TAM_PU –0.14 0.40
TAM_Attitude 0.34*** –0.11
TAM_PE 0.57*** 0.65***
May 0.52 0.40
TAM_PU 0.02 0.29**
TAM_Attitude 0.23 0.21**
TAM_PE 0.59*** 0.37***
June 0.59 0.48
TAM_PU 0.58* 0.40***
TAM_Attitude 0.40* 0.12
TAM_PE 0.24 0.38***
July 0.49 0.52
TAM_PU –0.12 0.27
TAM_Attitude 0.11 0.43***
TAM_PE 0.75** 0.32**

* Significant at the 0.05-level, ** significant at the 0.01-level, and *** significant at the 0.001-level.