Skip to main content
. 2021 Feb 23;26(2):026003. doi: 10.1117/1.JBO.26.2.026003

Fig. 7.

Fig. 7

(a) A multilinear-regression model was made and validated with scattered plot as shown where R2=0.69. (b) Bland–Altman plot analysis of the prediction model shows ±0.6  mm prediction variance form the measured value.