Skip to main content
. 2021 Feb 9;18(4):1662. doi: 10.3390/ijerph18041662

Figure 3.

Figure 3

The representation of plant production rate and total cost during emergency: (a) is showing the optimal controllable production rate required by manufacturing plant (b) is the representation of decreasing total cost of SCM by the proactive approach to cope with variable demand.