Table 1.
Author(s) | Model Type | Production Rate | Production Parameter | Imperfect Production | Resource Leveling | Cost Minimization | Disaster Based Model | Environment | ||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
SCM | Production System |
Constant | Variable | Lead Time | Cycle Time | Workforce | Machines | Geo- Thermal |
Pandemic | Deterministic | Uncertain | |||
Sabegh (2017) [10] | √ | √ | √ | √ | √ | √ | √ | √ | ||||||
Song (2018) [11] | √ | √ | √ | √ | ||||||||||
Cao (2018) [12] | √ | √ | √ | √ | √ | |||||||||
Kaur and Singh (2019) [13] | √ | √ | √ | √ | √ | √ | √ | √ | ||||||
Mishra (2017) [18] | √ | √ | ||||||||||||
Ouyang (2002) [27] | √ | √ | √ | √ | √ | |||||||||
Jha (2009) [28] | √ | √ | √ | √ | ||||||||||
Yi (2013) [31] | √ | √ | √ | |||||||||||
Glock (2011) [37] | √ | √ | √ | √ | ||||||||||
Sarkar (2018) [41] | √ | √ | √ | √ | √ | |||||||||
Connolly (2002) [47] | √ | √ | ||||||||||||
Proposed Re- Search |
√ | √ | √ | √ | √ | √ | √ | √ | √ | √ |