Table 5.
Decision Variable |
Abbreviation | SQP (Exponential Demand) |
SQP (Linear Demand) |
Pattern Search (Linear Demand) |
GA (Linear Demand) |
---|---|---|---|---|---|
Cycle times | T1 | 0.0383 | 0.022 | 0.022 | 0.022 |
T2 | 0.0424 | 0.025 | 0.025 | 0.025 | |
T3 | 0.0419 | 0.025 | 0.025 | 0.025 | |
Machine units | Kja1 | 4 | 6 | 6 | 6 |
Kja2 | 3 | 5 | 5 | 5 | |
Kja3 | 3 | 5 | 5 | 5 | |
Kjc1 | 4 | 7 | 7 | 7 | |
Kjc2 | 4 | 6 | 6 | 74 | |
Kjc3 | 4 | 6 | 6 | 6 | |
Labor required | Lja1 | 10 | 15 | 15 | 15 |
Lja2 | 7 | 12 | 12 | 12 | |
Lja3 | 7 | 12 | 12 | 12 | |
Ljc1 | 10 | 17 | 17 | 17 | |
Ljc2 | 10 | 15 | 15 | 15 | |
Ljc3 | 10 | 15 | 15 | 15 | |
Plant production | Pja1 | 600 | 900 | 1350 | 1350 |
Pja2 | 480 | 800 | 800 | 800 | |
Pja3 | 510 | 850 | 850 | 850 | |
Pjc1 | 520 | 910 | 910 | 910 | |
Pjc2 | 560 | 840 | 840 | 840 | |
Pjc3 | 600 | 900 | 900 | 900 | |
Total cost of SCM | TCj | 124,835.5 | 226,282.3 | 226,282.3 | 507,138.85 |