Skip to main content
. 2021 Feb 9;18(4):1662. doi: 10.3390/ijerph18041662

Table 5.

The optimal result of the supply chain model with emergency level Ω = 1.

Decision
Variable
Abbreviation SQP (Exponential
Demand)
SQP (Linear
Demand)
Pattern Search
(Linear Demand)
GA (Linear
Demand)
Cycle times T1 0.0383 0.022 0.022 0.022
T2 0.0424 0.025 0.025 0.025
T3 0.0419 0.025 0.025 0.025
Machine units Kja1 4 6 6 6
Kja2 3 5 5 5
Kja3 3 5 5 5
Kjc1 4 7 7 7
Kjc2 4 6 6 74
Kjc3 4 6 6 6
Labor required Lja1 10 15 15 15
Lja2 7 12 12 12
Lja3 7 12 12 12
Ljc1 10 17 17 17
Ljc2 10 15 15 15
Ljc3 10 15 15 15
Plant production Pja1 600 900 1350 1350
Pja2 480 800 800 800
Pja3 510 850 850 850
Pjc1 520 910 910 910
Pjc2 560 840 840 840
Pjc3 600 900 900 900
Total cost of SCM TCj 124,835.5 226,282.3 226,282.3 507,138.85