Skip to main content
. 2021 Feb 9;18(4):1662. doi: 10.3390/ijerph18041662

Table 6.

The utilization of resources with respect to the emergency levels (Ω) due to COVID-19 pandemic.

Decision
Variables
Abbreviations Ω = 0 Ω = 1 Ω = 2 Ω = 3 Ω = 4 Ω = 5
Machines utilization K1a 7 6 6 5 4 4
K2a 6 5 5 4 4 3
K3a 6 5 5 4 3 3
K1c 8 7 7 6 5 4
K2c 7 6 5 5 4 3
K3c 6 6 5 4 4 3
L1a 17 15 15 12 10 10
L2a 15 12 12 10 10 7
L3a 15 12 12 10 7 7
Labors
required
L1c 19 17 17 15 12 10
L2c 17 15 12 12 10 7
L3c 15 15 12 10 10 7
P1a 1050 900 900 750 600 600
P2a 960 800 800 640 640 480
P3a 1020 850 850 680 510 510
Plant
Production rate
P1c 1040 910 910 780 650 520
P2c 980 840 700 700 560 420
P3c 900 900 750 600 600 450
Total cost of
SCM
TCj 263,420.5 226,282 201,373 166,475 137,547 110,251