Skip to main content
. 2021 Mar 5;21(5):1818. doi: 10.3390/s21051818

Figure 64.

Figure 64

Measured strain distribution at the rock-side layer in peripheral direction: (a) 12 h after installation at top-heading, (b) 48 h after installation at top-heading, (c) 12 h after installation at invert and (d) 48 h after installation at invert [147].