Skip to main content
. 2021 Mar 5;21(5):1818. doi: 10.3390/s21051818

Figure 65.

Figure 65

(a) Tunnel and distributed temperature and strain system layout and (b) optical fiber implementation on iron bars of the braced girder of the primary lining [146].