Skip to main content
. 2021 Mar 18;17(3):e1008770. doi: 10.1371/journal.pcbi.1008770

Fig 2. Building our portfolio and CV with ERP.

Fig 2

Research products can build off of content generated in either the Explore or the Refine Phase. As they did in Fig 1A, turquoise circles represent potential research products generated as the project develops Closed circles represents research project within scope of project, while open circles represent beyond scope of current project. This figure emphasizes how those research products project onto a timeline and represent elements in our portfolio of work or lines on a CV. The ERP workflow emphasizes and encourages production, beyond traditional, academic research products, throughout the lifecycle of a data-intensive project rather than just at the very end.