Skip to main content
. 2021 Mar 23;41(6):1487–1494. doi: 10.1038/s41372-021-01033-6

Fig. 1. Key Driver Diagram.

Fig. 1

Diagram outlining the project-specific aim, key drivers, and change concepts.