Mix design of the concrete (kg/m3) containing crushed magnetite and/or crushed serpentine in the dry or prewetted state that was compacted using vibration.

Mix Constituents, w/c Ratio Concrete
V1B0 V3B0 V1B1 V3B1 V1B2d1 V1B2d2 V1B2d3 V1B2d4 V1B2m1 V1B2m2 V3B2m3 V3B2m4 V1B3m V1B3d V3B3d V1B4m V1B4d V3B4d
Cement (CEM I or CEM III) 350 350 350 350 350 350 350 350 350 350 350 350 350 350
Water 168 168 168 168 168 211 211 168 200 200 189 168 189 168
w/c 0.48 0.48 0.48 0.48 0.48 0.60 0.60 0.48 0.57 0.57 0.54 0.48 0.54 0.48
w/ceff - - 0.35 0.46 0.47 0.48 0.48 0.35 0.48 0.48 0.48 - 0.48 -
Quartz sand 0/2 687 371 371 510 654 371 371 371 371 371 371 371 371 371
Crushed basalt 2/16 1001
Crushed magnetite 0/5 300 839 772 772 895 895
Crushed magnetite 0/16 1846 1018 1018
Crushed serpentine 0/2 273 136 273 273 273 273 273
Crushed serpentine 2/8 909 909 909 909 909 909 909 909 485 485 485 485
Crushed serpentine 8/16 273 273 273 273 273 273 273 273 371 371 485 485
HRWR (%m.c.) CEM I
CEM III/A
0.2
0.15
0.2 0.15 1.2 1.5 1.0 0.5 0.5 2.0 0.5 1.66 0.3 0.3
0.2
0.48 0.57
0.4
Remarks (1) (2) (3) (4) (5) (6) (6) (6) (6)

Remarks: (1) 50% fraction of 0–2 mm of serpentine replaced with quartz sand (by volume). (2) 100% fraction of 0–2 mm of serpentine replaced with quartz sand (by volume). (3) Additional water added to the mixture (3% of serpentine by weight). (4) Water-saturated serpentine: water content of 3% of serpentine by weight. (5) Water-saturated serpentine: water content of 3% of serpentine by weight, content of water in the mixture was corrected. (6) Water-saturated serpentine: water content according to Table 3.