Skip to main content
. 2021 Mar 25;14(7):1604. doi: 10.3390/ma14071604

Table 2.

Mass loss in decomposition temperature ranges at 7 and 28 days.

Mark 110 °C–170 °C 180 °C–350 °C 430 °C–560 °C Amount of Dry Basis Portlandite, % Amount of Cement Basis Portlandite, % 690 °C–850 °C
C7 2.8 3.0 3.0 14.0 14.0 2.6
NS7 3.2 3.0 2.4 11.5 11.5 4.6
PSw7 3.2 3.2 2.7 12.6 12.9 5.8
NS/PSw7 2.8 2.7 2.3 10.9 11.2 6.7
NS/PSw/FCCCw7 3.4 3.2 2.2 10.5 11.9 4.7
C28 3.2 3.4 2.9 14.0 14.0 4.4
NS28 3.2 3.4 2.9 13.8 13.8 4.2
PSw28 3.2 3.3 2.9 13.6 13.9 5.2
NS/PSw28 3.1 3.2 2.8 13.2 13.5 5.1
NS/PSw/FCCCw28 3.6 3.7 2.0 9.7 11.0 4.4