Liberian Government Hospital Bomi |
Water |
-
-
Concrete water tower (capacity 12,000 gallons)
-
-
Drilling of new borehole
-
-
Water transmission and distribution systems including fixtures
-
-
Generator (80 kilovolts)
-
-
Solar-powered submersible pumps
|
$172,528.76 |
$194,057.00 |
Sanitation |
-
-
Rehabilitate in-patient toilets
-
-
Rehabilitate leaking sewer lines
-
-
Rehabilitate the storm drainage system
-
-
Construct laundry infrastructure with storage and drying compartments
|
Hygiene |
|
Waste Management |
-
-
Construct a new burn pit with shelter
-
-
Construct a new ash pit
-
-
Construction of new septic tank with leach field
-
-
Rehabilitate existing mortuary
|
St. Timothy Hospital |
Water |
-
-
Rehabilitate the spring box
-
-
Construction of ground water storage tank
-
-
Construction of water tower with storage capacity of 6000 gallons
-
-
Construction of water transmission system from water source to storage tank and from storage tank to water tower
-
-
Construction of water transmission system from borehole to storage tank
-
-
Generator (50 kilovolts)
-
-
Solar-powered submersible pumps
|
$203,263.68 |
$148,527.00 |
Sanitation |
-
-
Construction of septic tank with leach field
-
-
Rehabilitation of sewer lines
-
-
Construction of toilets
-
-
Construction of laundry facility
-
-
Rehabilitation of storm water drainage system
|
Hygiene |
|
Waste Management |
-
-
Construction of new burn pit
-
-
Construction of placenta pit
-
-
Construction of an ash pit
-
-
Construction of fence for waste management section
-
-
Construction of mortuary
|