Skip to main content
. 2021 Mar 24;21(7):2277. doi: 10.3390/s21072277

Table 4.

Analysis of the peak cadence registered by the SRM and the FAD power meters during all-out sprints.

PEAK CADENCE
SRM (rev·min−1) FAD (rev·min−1) TEM (rev·min−1) CV% ICC Pearson
r-Value
Cadence × Measurement System
p-Value
Effect Size
p2)
Mean ± SD CV Mean ± SD CV
FCC Sitting ALL-OUT 129.8 ± 17.9 13.79% 129.9 ± 17.7 13.61% 0.79 0.61% 0.83% 0.99 0.99 0.299 0.036
ALL-OUT 130.5 ± 13.8 10.55% 130.8 ± 13.8 10.54% 0.84 0.64% 0.99 0.99
ALL-OUT 128.4 ± 12.2 9.51% 129.1 ± 11.8 9.12% 1.61 1.25% 0.98 0.98

Abbreviations: CV, coefficient of variation; CV%, percentage of the TEM; FCC, freely chosen cadence; LoA, Limits of Agreement; SD, standard deviation; TEM, typical error of measurement.