Table 4.
The expected total cost for , and usage rate (u) = 200,…,500.
τ (months) | ETC ($) |
||||
---|---|---|---|---|---|
u = 200 | u = 400 | u = 500 | u = 600 | ||
1 | 36 | 1411 | 1464 | 1499 | 1478 |
2 | 24 | 883.591 | 976.809 | 1048 | 1006 |
3 | 12 | 717.219 | 850.606 | 942.031 | 890.777 |
4 | 9 | 641.5 | 810.018 | 904.5 | 854.655 |
6 | 6 | 581.341 | 795.817 | 899.055 | 837.956 |
9 | 4 | 566.591 | 812.607 | 940.019 | 875.89 |
12 | 3 | 578.974 | 860.069 | 932.335 | 912.136 |
18 | 2 | 616.985 | 898.54 | 904.144 | 903.839 |
ETC, expected total cost.