Table 6.
The expected total cost for , and usage rate (u) = 200,…,500.
τ (months) | ETC |
||||
---|---|---|---|---|---|
u = 200 | u = 400 | u = 500 | u = 600 | ||
1 | 36 | 1293 | 1402 | 1407 | 1413 |
2 | 24 | 756.57 | 878.89 | 892.656 | 909.226 |
3 | 12 | 580.429 | 719.964 | 744.998 | 774.288 |
4 | 9 | 494.744 | 654.705 | 691.758 | 732.633 |
6 | 6 | 414.625 | 620.394 | 677.119 | 729.258 |
9 | 4 | 371.875 | 642.415 | 701.93 | 735.868 |
12 | 3 | 360.712 | 671.449 | 714.127 | 780.949 |
18 | 2 | 367.64 | 710.094 | 818.909 | 885.864 |
ETC, expected total cost.