Skip to main content
. 2021 Mar 31;11:664996. doi: 10.3389/fonc.2021.664996

Table 2.

Analysis of pre-planning and intraoperative/post-plan parameters.

Parameter Planned Intraoperative Post-plan p value
Depth of needle 6.21 ± 0.24 6.23 ± 0.24 0.903
Angular of needle 83.09 ± 3.66 83.14 ± 3.64 0.985
D90 160.0 ± 6.2 156.3 ± 9.1 0.515
D100 83.6 ± 7.1 80.8 ± 10.0 0.662
V100 19.4 ± 4.8 19.2 ± 4.9 0.958
V150 15.1 ± 3.8 14.6 ± 3.7 0.865
V200 9.9 ± 2.8 9.5 ± 2.8 0.872
CI 0.52 ± 0.04 0.49 ± 0.04 0.278
EI 0.91 ± 0.20 1.04 ± 0.25 0.456
HI 0.31 ± 0.14 0.31 ± 0.15 0.989

Plus-minus data = mean ± 1.96 standard error; D90 and D100 refer to the dose delivered to the 90% or 100% of gross tumor volume and V100, V150, and V 200 refer to the percentage of gross tumor volume receiving 100% or 150% or 200% of prescription dose, respectively; CI, Conformity index; EI, External index; HI, Homogeneity index.