Table 2.
Parameter | Estimate | SE | Z | p |
---|---|---|---|---|
Dependent variable: commission errors | ||||
Intercept | 2.03 | 0.05 | 41.17 | <.001 |
Block [400 ms ISI (0) vs. 600 ms ISI (1)] | −0.46 | 0.05 | −9.52 | <.001 |
Block [400 ms ISI (0) vs. 800 ms ISI (1)] | −0.84 | 0.06 | −14.15 | <.001 |
Block [400 ms ISI (0) vs. 1000 ms ISI (1)] | −1.13 | 0.06 | −17.62 | <.001 |
Dependent variable: omission errors | ||||
Intercept | 0.73 | 0.12 | 6.30 | <.001 |
Block [400 ms ISI (0) vs. 600 ms ISI (1)] | −1.39 | 0.23 | −6.17 | <.001 |
Block [400 ms ISI (0) vs. 800 ms ISI (1)] | −2.62 | 0.21 | −12.32 | <.001 |
Block [400 ms ISI (0) vs. 1000 ms ISI (1)] | −2.83 | 0.34 | −8.24 | <.001 |
GNG = Go/No‐Go Task; ISI = Inter‐stimulus interval.