Table 3.
Measurement Model Summary
| Research Construct | Items | Factor Loading | p | CR | AVE |
|---|---|---|---|---|---|
| FAM | FAM1 | 0.772 | *** | 0.881 | 0.712 |
| FAM2 | 0.844 | *** | |||
| FAM3 | 0.910 | *** | |||
| INT | INT2 | 0.782 | *** | 0.893 | 0.737 |
| INT3 | 0.893 | *** | |||
| INT4 | 0.896 | *** | |||
| PU | PU1 | 0.871 | *** | 0.910 | 0.717 |
| PU2 | 0.858 | *** | |||
| PU3 | 0.842 | *** | |||
| PU4 | 0.815 | *** | |||
| PI | PI1 | 0.913 | *** | 0.944 | 0.849 |
| PI2 | 0.928 | *** | |||
| PI3 | 0.923 | *** |
Notes: ***p < 0.001 (two-tailed); N = 269.
Abbreviations: CR, composite reliability; AVE, average variance extracted.