Skip to main content
. 2020 Apr 6;4(6):498–507. doi: 10.1017/cts.2020.37

Fig. 1.

Fig. 1.

Conceptual map of the EASI-PRO implementation process. Implementation consists of both planning work (shown in blue) and technical work (coding, configuration, and technical build). The present study focused solely on planning work.