Skip to main content
. 2021 Jan-Mar;33(1):125–137. doi: 10.5935/0103-507X.20210014

Figure 2S.

Interaction plots between delay and other variables in logistic regression model.

95%IC - 95% of confidence interval; MV - mechanical ventilation; CRRT - continuous renal replacement therapy; LOS - length of stay; SOFA - Sequential Organ failure Assessment; APACHE - Acute Physiology and Chronic Health Evaluation; CVL - central venous line.

Figure 2S