Skip to main content
. 2011 Dec 2;14(1):45–50. doi: 10.1111/j.1751-7176.2011.00559.x

Table IV.

 26‐Item Hypertension Management Knowledge Questionnaire

Baseline Mean Score (SD) Follow‐up Mean Score (SD) 95% CI P Value 
(2‐Tailed)
Intervention (n=9) 13.11 (3.06) 17.44 (1.59) 1.81–6.85 <.01
Control (n=3) 14.33 (3.21) 13.00 (3.46) −2.77 to 0.10 .06

Abbreviations: CI, confidence interval; SD, standard deviation.