Table 1.

Price points used in the double-bound dichotomous choice method. The starting points are listed in the last column; the lowest and highest amounts for the follow-up questions are in parentheses.

Safe Sanitation Option Respondent 1 Full Price Price Points
(Ranging from 80% to 10% Discounts)
Pour-flush to lined pit (pit + slab + superstructure) Landlords/
homeowners
87,100 KES (5000); 10,000; 20,000; 30,000; 40,000; 50,000; 70,000; (90,000) KES
Pour-flush to sewer (sewer connection + slab + superstructure) Landlords/
homeowners
82,900 KES (5000); 10,000; 20,000; 30,000; 40,000; 50,000; 70,000; (90,000) KES
Pour-flush to lined pit (pit + slab + superstructure), in installments Landlords/
homeowners
9000 KES 1
per month
(500); 1000; 2000; 4000; 3000; 5000; 7000; (9000) KES per month
Both pour-flush options (increased rent) Tenants Variable 2 (100), 200, 400, 600, 800, (900) KES per month

1 Based on the full cost of 87,100 KES, with a 20% interest rate per annum, in 12 monthly installments. 2 The amount of rent increase is variable, though a previous study found that rents were approximately 655 KES higher when there is sanitation [26].