Skip to main content
. 2021 May 18;10:71. doi: 10.1186/s40249-021-00857-w

Fig. 5.

Fig. 5

Quality assessment. a The funnel plots of all outcome odds ratio analysis. b The funnel plot of pooled hazard ratio analysis. c The sensitivity analysis of OR studies by omitting one at a time. d The sensitivity analysis of all HR studies. CI Confidence interval, HR Hazard ratio, OR Odds Ratio