Skip to main content
. 2021 Apr 23;16(5):741–748. doi: 10.1007/s11548-021-02364-7

Table 2.

Error measurement results

Error measurement Planned target to center of core Planned target to core segment
Number of samples 64 64
Average error (mm) 2.57 2.05
Min (mm) 0.93 0.20
Max (mm) 4.68 4.61
Standard deviation (mm) 1.02 1.24
95% confidence interval [1.93–3.21] [1.53–2.56]
Interobserver variance (mm2) 0.0029 0.039