Skip to main content
. 2021 May 19;2:51. doi: 10.1186/s43058-021-00151-8

Table 4.

Intervention timeline for each state

5/2019 10/2019 5/2020 10/2020 5/2021 10/2021 5/2022 10/2022 5/2023
Pair 1 County 1a AI AI AI/S S S S S S S
County 2 C C AI AI AI/S S S S S
Pair 2 County 3 AI AI AI/S S S S S S
County 4 C C AI AI AI/S S S S
Pair 3 County 5 AI AI AI/S S S
County 6 C C AI AI AI/S

AI active intervention period, C control period, S sustainability period, AI/S AI ends and S begins

aPilot