Table 2.
Process capability index factor.
F1 (19) | Factor loading | Bottleneck variables |
---|---|---|
14 | -0.635 | Non-conforming material |
20 | -0.686 | Energy |
22 | -0.832 | Equipment failure |
23 | -0.739 | Market demand |
34 | -0.577 | Labour insufficiency |
37 | -0.781 | Machine breakdown |
38 | -0.640 | Machine repair |
39 | -0.709 | Tools unavailability |
40 | -0.618 | Materials |
41 | -0.580 | Multi-stage supply logistics |
42 | -0.780 | Operations |
43 | -0.637 | Operators skills |
45 | -0.765 | Preventive maintenance |
62 | -0.651 | Resources shortage |
63 | -0.533 | Scheduling policies |
66 | -0.769 | Supply constraints |
67 | -0.529 | Task time variation |
69 | -0.811 | Material unavailability |
70 | -0.615 | Unscheduled downtime |