Table 2.

Process capability index factor.

F1 (19) Factor loading Bottleneck variables
14 -0.635 Non-conforming material
20 -0.686 Energy
22 -0.832 Equipment failure
23 -0.739 Market demand
34 -0.577 Labour insufficiency
37 -0.781 Machine breakdown
38 -0.640 Machine repair
39 -0.709 Tools unavailability
40 -0.618 Materials
41 -0.580 Multi-stage supply logistics
42 -0.780 Operations
43 -0.637 Operators skills
45 -0.765 Preventive maintenance
62 -0.651 Resources shortage
63 -0.533 Scheduling policies
66 -0.769 Supply constraints
67 -0.529 Task time variation
69 -0.811 Material unavailability
70 -0.615 Unscheduled downtime