Table 3.
Manufacturing process restraint factor.
F2 (8) | Factor loading | Bottleneck variables |
---|---|---|
1 | 0.732 | Automatically Guided Vehicle (AGV) |
5 | 0.554 | Capacity utilization |
8 | -0.502 | Tool changing time |
13 | -0.537 | Complex process adjustment |
28 | -0.622 | Function |
54 | -0.640 | Different models arrival |
59 | 0.812 | Random event |
75 | -0.834 | Raw materials flow |