Table 3.
Manufacturing process restraint factor.
| F2 (8) | Factor loading | Bottleneck variables |
|---|---|---|
| 1 | 0.732 | Automatically Guided Vehicle (AGV) |
| 5 | 0.554 | Capacity utilization |
| 8 | -0.502 | Tool changing time |
| 13 | -0.537 | Complex process adjustment |
| 28 | -0.622 | Function |
| 54 | -0.640 | Different models arrival |
| 59 | 0.812 | Random event |
| 75 | -0.834 | Raw materials flow |