Table 5.

Industrial transport times of the missions in the digital twin and in the physical implementation in Scenario 2.

Mission (Targets in Order) Digital Twin Time (s) Real Implementation Time (s) Accuracy (%)
Milling—Drilling—Turning 81.6 81 99.26
Milling—Turning—Drilling 95.0 96 98.96
Turning—Drilling—Milling 76.3 75 98.30
Turning—Milling—Drilling 72.5 73 99.32
Drilling—Turning—Milling 95.8 95 99.16
Drilling—Milling—Turning 85.2 87 97.93