Skip to main content
. 2021 May 13;21(10):3411. doi: 10.3390/s21103411

Table 5.

Numerical results—explanation.

Notation     Description
TLR optimal frame size obtained from the linear relaxation of the problem after the c-sets generation process
TMIP optimal frame size obtained from frame size minimization
|C| number of generated c-sets
tMP total computation time of solving master problem during c-sets generation process
tPP total computation time of solving pricing problem during c-sets generation process
tMIP computation time of solving the final MIP version of the problem